Los Angeles Multifamily Sale Preparation
Do I Need to Complete a Soft-Story Retrofit Before Selling My LA Apartment Building?
No. A Los Angeles apartment building can be sold before a required soft-story retrofit is complete. The seller should disclose the known condition and compliance status, and buyers will account for the remaining work, deadline, financing and construction risk in their offers. For orders served in the original 2016–2017 rollout, the seven-year completion deadline has passed; check the current city file and enforcement status before pricing. Compare the proceeds and timing of finishing the work with a sale that assigns the work to the buyer.
Andres can review the compliance stage alongside the sale valuation.
Request a ValuationA sale with work outstanding can appeal to an investor willing to manage construction, but the offer may reflect more than a contractor's quoted price. The buyer must also evaluate the city deadline, remaining approvals, financing requirements and the possibility that the final scope changes. A completed project can make those questions easier to resolve, while requiring the owner to fund the work and wait for completion.
Start with the actual city file and a written engineering assessment. Then compare realistic buyer offers and the time needed for each route. The better choice depends on the building and the seller's cash, timing and tolerance for construction risk.
Review the building and its remaining compliance steps with Kingside.
Discuss Your BuildingHow do I confirm whether my building needs a retrofit?
Check the property record and any order with the Los Angeles Department of Building and Safety (LADBS), then ask a structural engineer to assess the building and existing work. The program covers qualifying wood-frame buildings with two or more stories, built under standards enacted before 1978, with parking or similar open space creating soft, weak or open-front wall lines. The original ordinance specifies a new-building permit application before January 1, 1978, or a city determination based on the building code if no permit is found. Buildings used solely for residential purposes with three or fewer units are exempt. Check the LADBS list, property record and Certificate of Compliance; appearance alone does not establish status.
Locate the order date, submitted plans, plan-check comments, permits, inspection records and final signoff. LADBS requires plans or proof of prior work within two years of the order, a permit within three and a half years and completion within seven years. Orders in the original rollout began in 2016 and 2017, so their seven-year deadlines have passed as of October 29, 2026. An unfinished project under one of those orders is generally overdue unless the city granted an extension or other relief. Ask LADBS for the current status, applicable dates and any enforcement case number before pricing.
A seller who cannot locate a document should identify the gap rather than describe the project as complete. An approved plan, a permit and a final inspection are different stages. A buyer needs to know which stage the property has actually reached and what remains to be done.
Discuss the order, records and sale timing with Andres.
Call (323) 376-2469Can I sell before the retrofit is complete?
Yes. The Los Angeles soft-story ordinance imposes compliance obligations on the owner; it does not make completion a condition of sale. The city obligation continues after transfer: the ordinance includes successors and assignees in its definition of legal owner, and an overdue deadline and enforcement exposure can remain. The purchase agreement can allocate costs and risk between the parties, but does not alter the city’s enforcement authority. Confirm the specific transaction and disclosure requirements with a California real estate attorney.
A property with an order and no plans presents different uncertainty from one with approved plans, a permit and construction underway. A completed project with final signoff provides a different record again. Gather the documents for the stage you have reached and present them consistently in the offering materials and diligence responses.
A buyer comfortable managing an overdue project may seek a price reduction, credit or escrow arrangement, while a financing-sensitive buyer may require completion or decline to proceed. The difference in offers reflects risk as well as the estimated construction bill; there is no reliable standard percentage discount. The deal terms are negotiable and must fit the buyer’s financing and the purchase agreement. Ask the broker to compare offers by expected net proceeds, contingencies and likelihood of closing, rather than focusing only on the headline price.
Review the marketing and buyer-diligence process with Kingside.
Discuss SellingWhat should I disclose to a buyer?
Disclose the known Los Angeles soft-story condition, the city order and the current compliance status, and have counsel advise on the forms and timing for your transaction. An order, engineering report or estimate can be material to a buyer’s assessment. Give counsel the complete record, including unfavorable findings and correspondence, so the disclosure accurately reflects what is known.
Provide the order and subsequent LADBS communications, plans and revisions, permits, inspection results, contractor proposals and any documentation of completed work. Identify deadlines and whether they have been confirmed with the city. If a plan was rejected, a permit expired or a final inspection remains open, label that fact plainly instead of allowing the buyer to infer a completed retrofit.
California Civil Code section 1102 generally governs the statutory Transfer Disclosure Statement for residential property of one to four units, so most buildings with five or more units fall outside that form’s scope. Sellers still have a duty to disclose known material facts. Ask a real estate attorney to identify the applicable obligations and coordinate a written record of what was provided and when.
Kingside can coordinate the sale preparation while your attorney directs disclosure.
Discuss Your DocumentsHow will buyers price the unfinished work?
Los Angeles buyers generally start with the anticipated cost to complete the retrofit, then consider uncertainty around scope, timing and financing. Request a written assessment from a structural engineer and a contractor proposal tied to the actual plans. Ask what each figure includes, what is excluded, how long it is valid and which conditions could change the price.
As a hypothetical, suppose an estimate is $192,000 and the parties add a 15 percent contingency: the resulting $220,800 potential credit is an illustration, not a quote or a standard discount. A buyer may use a different contingency or structure, and an estimate alone does not establish the final contract price.
Ask whether design, permitting, construction, inspection, tenant coordination and other project costs are included or separate. Identify the assumptions behind each line item and the party responsible for confirming them. A documented scope helps both sides discuss the same work, although hidden conditions can still change the final cost.
Ask the engineer, contractor and LADBS for a property-specific schedule covering design, plan check, construction and inspection. A missed deadline or tenant coordination can affect sequencing; do not treat a generic schedule as a commitment.
Compare a buyer credit with the costs and timing of completing the work.
Review the NumbersAccount for tenant cost recovery and habitability. As of October 29, 2026, LAHD’s seismic retrofit program permits an approved temporary surcharge for up to 50% of eligible costs, divided among rental units, with surcharges for units subject to the RSO, capped at $38 per unit per month for 120 months; the period may be extended until the approved amount is collected. The application is due within 12 months after completion. Do not assume approval or full collection: obtain the determination, rent roll and payment history. If the seller completes the project, discuss filing and collection with LAHD; if the buyer completes it, identify who will retain the invoices and apply. Counsel and LAHD should confirm whether an existing or pending approval continues after transfer, and the contract should allocate the rights and responsibility. Include only supportable recovery in the valuation.
Bring the LAHD determination and project costs to your valuation discussion.
Ask About RecoveryLAHD requires a Tenant Habitability Plan application for mandated soft-story work. Address tenant notices, disruption and any temporary relocation in the scope and budget. The city’s RSO may govern rent and tenancy protections; California’s Tenant Protection Act, including Civil Code sections 1947.12 on rent increases and 1946.2 on just cause, can also apply depending on exemptions and local protections. LA’s Just Cause Ordinance protects many non-RSO tenancies. Have counsel and LAHD determine the rules for each unit; a sale or retrofit does not itself permit a rent increase or termination.
Should I retrofit first or sell with a credit?
For a building in Los Angeles, choose the route that produces the better risk-adjusted outcome for your circumstances after comparing net proceeds, cash needs and timing. Finishing first means arranging and funding the project, waiting for the required approvals and inspections, and documenting final signoff. A completed project may reduce a buyer’s construction uncertainty and make the building accessible to more financing-sensitive buyers.
Selling with a credit allocates project costs under the negotiated agreement; the buyer also becomes responsible for the outstanding city obligation as the new owner. The seller avoids funding the entire project before closing, but the buyer may seek compensation for project management, uncertainty and the risk of a higher final cost. The seller should evaluate the actual offer rather than assume either that a credit saves money or that completed construction adds its full cost to the sale price.
Andres can work through the building-specific sale assumptions with you.
Meet Andres DiazBuild a side-by-side comparison. For the first route, estimate the completed-property sale price and subtract the full owner-paid project cost, carrying costs during the delay and ordinary sale costs. For the second, estimate the as-is price after any credit and subtract ordinary sale costs. Use the same assumptions for items common to both paths, and ask your tax and legal advisers about transaction-specific effects.
Run a sensitivity check if the construction price, timeline or completed sale price is uncertain. A delay can change the result, and a higher credit is not necessarily worse than funding an expensive project and holding the building longer. Keep each assumption visible so the decision can be revised when a bid or offer arrives.
Can a buyer finance an unfinished retrofit?
A buyer of a Los Angeles property may be able to obtain financing, but the answer depends on the lender, loan program, building and compliance stage. Some lenders may require approved plans, a permit, additional review or completion before closing. A buyer using cash or a lender familiar with the work may evaluate the risk differently. Ask for evidence that the buyer has discussed the actual property and city file with its lender.
Fannie Mae’s multifamily guide addresses seismic risk, and Freddie Mac’s Chapter 64 sets out seismic assessment requirements. Those guides and lender requirements can change. The buyer’s lender should confirm current requirements and any required seismic analysis, approval, repair deadline or reserve before either side relies on a proposed financing structure.
Discuss the buyer pool and the documents lenders may request.
Call Andres: (323) 376-2469A holdback may be discussed as a way to reserve funds for specified work after closing, but its availability and terms are lender and transaction specific. Confirm who funds and controls the account, what releases the money, how overruns are handled and whether the purchase agreement and lender documents use consistent deadlines. Counsel and escrow should review the actual documents.
What if my compliance deadline has passed?
Confirm the property’s status directly with the Los Angeles Department of Building and Safety (LADBS) and bring the order and enforcement correspondence to your engineer and attorney. An overdue order can increase uncertainty for a buyer and may affect the time available to complete work. The ordinance provides for prosecution or administrative enforcement, and violations can lead to penalties or action affecting occupancy. The consequences depend on the city’s action, extensions and the property’s circumstances.
Prepare a factual timeline showing the order date, completed steps, open items and communications with the city. Ask the engineer what work and approvals remain, and obtain a schedule that can be checked against the city’s current instructions. Do not promise an extension or represent a submitted plan as an approved plan without documentation.
A sale may still be possible, but a buyer will need to evaluate the outstanding obligation and any active enforcement. Share the known facts promptly and let counsel advise how they should appear in the disclosures and contract. A buyer’s willingness to proceed does not establish that the city has changed a deadline.
Bring the city correspondence and current engineering documents to the discussion.
Contact KingsideWhat should I do before listing?
Build a single, dated file for the Los Angeles retrofit and assign each open question to the person who can answer it. Request the city record, inventory plans and permits, and obtain an engineer’s assessment and contractor proposal. Order the Report of Residential Property Records and Pending Special Assessment Liens (Form 9, or 9A report) early, and have counsel and escrow confirm the requirements and delivery timing for the transaction. Ask the engineer to identify whether the estimate assumes a specific design and whether any inspection or signoff remains outstanding.
Have counsel review the known facts and disclosure package. Ask the broker to prepare a valuation that distinguishes a completed project from an as-is offering, then compare estimated proceeds and timing. Confirm the assumptions with your tax adviser and lender where appropriate, particularly if the property has existing debt or the sale is part of a broader plan.
When offers arrive, compare the price, credit, financing, diligence period and responsibility for future work together. A higher offer that depends on unconfirmed financing or unresolved project assumptions may be less certain than an offer with a clear funding plan. Keep records of buyer questions and update the file when new facts emerge.
Review the compliance file, valuation and buyer process with Kingside.
Start the Sale PreparationFrequently Asked Questions
Can I sell my apartment building before completing the retrofit?
Yes. A Los Angeles building can be sold before completion, but the remaining compliance obligation matters to the buyer. Disclose known conditions and have counsel review the transaction.
How do I know if my building is covered?
Check the property record and any order with LADBS, and ask a structural engineer to assess the building. Appearance alone does not establish the property’s status.
What documents should I give a buyer?
Gather the city order and correspondence, plans, permits, inspection records, engineering assessments, estimates and proof of completed work. Ask counsel to direct the disclosure package.
How much will a buyer deduct for unfinished work?
The amount is negotiated and depends on the documented scope, buyer assumptions, deadline and financing. Obtain a property-specific estimate and compare actual offers.
Does finishing the retrofit guarantee a higher net sale price?
No. Completion may reduce buyer uncertainty, but the owner must account for project costs and the time before sale. Compare both routes using building-specific assumptions.
Can a buyer obtain financing before the work is finished?
Possibly. Requirements vary by lender and loan program. The buyer should confirm the property’s status, required approvals and any holdback directly with its lender.
What if the deadline has passed?
Confirm the current status with LADBS, assemble the enforcement record and consult an engineer and attorney. A buyer will need to evaluate the remaining work and any active enforcement.
Andres can help compare the sale options and the information buyers will need.
Request a Sale ConsultationSources
- LADBS Soft-Story Retrofit Program and Los Angeles Municipal Code section 91.9311.
- LAHD Seismic Retrofit Work Program and Tenant Habitability Plan application.
- California Civil Code section 1102, section 1947.12 and section 1946.2; LAHD renter protections.
- Fannie Mae Multifamily Guide, Seismic Risk and Freddie Mac Multifamily Guide, Chapter 64. Confirm current requirements with the lender.
The guide provides general information and is not legal, tax, lending or engineering advice. Confirm the building's current status with LADBS, obtain a property-specific engineering assessment and consult qualified advisers before making a decision.